![](https://reachsubsea.no/wp-content/uploads/2023/03/DJI_0131-scaled-1.jpg)
Diver-less riser flange replacement
Vessel | Client | Location | Period | Water Depth |
---|---|---|---|---|
Havila Subsea | BHP | Trinidad & Tobago | Winter 2019 | 300 – 370 m |
Winter 2019
Reach Subsea successfully completed a diver-less riser flange replacement project in December 2019 for a Caribbean client.
The project was performed using 2xWROV systems working in parallel on board the Havila Subsea. The successful project completed 40 % ahead of scheduled, with a high safety participation amongst the onboard crew leading to zero incidents during the offshore execution.