
Boulder removal
Vessel | Client | Location | Period | Water Depth |
---|---|---|---|---|
Topaz Tiamat | Equinor | Mediterranean Sea, Algeria | 2019 | 350 m |
During summer season UXO clearance were performed with good results. Dredging with ScanMachine at 350 m water depth on Troll B field, was a major part of the project.




