Boulder removal
| Vessel | Client | Location | Period | Water Depth |
|---|---|---|---|---|
| Topaz Tiamat | Equinor | Mediterranean Sea, Algeria | 2019 | 350 m |
During summer season UXO clearance were performed with good results. Dredging with ScanMachine at 350 m water depth on Troll B field, was a major part of the project.




